Quality comes first here

UL, ISO, IPC, ITAR, NIST, MIL-SPEC and BABA, and the process behind each one.

Our customers get audited by electrical inspectors, supplier quality teams, defense primes and federal contracting officers. Each one checks something different. We carry all of it.

Talk to an Engineer

Certifications We Hold

UL 1558, UL 891 and UL 508A

Metal-enclosed low voltage power circuit breaker switchgear, dead-front switchboards, and industrial control panels.

A listing is a file rather than a logo. The inspector reviewing your submittal checks which file the equipment was built under, and that answer decides whether the package clears or comes back marked up.

BABA

Build America, Buy America compliant for federal and federally funded work, including utility and infrastructure programs carrying domestic sourcing requirements.

The first piece has to pass before the second one starts before a production run begins, the first assembly off the line is inspected against the drawing and every crimp is checked. Nothing else gets built until that piece passes.

ISO 9001:2015, with APQP and PPAP

Advanced product quality planning runs before the first part is made rather than after the first problem. Production part approval means the process that produced the sample is the process that produces the run. Configuration management keeps the revision in the cabinet matched to the revision in the file, so the drawing you approved is the drawing that ships.

Advanced Functional Testing

Find the failures here, not in the field. Hi-pot isolation testing. Grounding continuity analysis. Low resistance insulation screening. Automated wire harness validation. Environmental Stress Screening, including thermal cycling and moisture intrusion. Load simulation.

Test fixtures are built for your assembly rather than adapted from a generic rig, and every unit gets 100% functional validation, documented and signed off.

IPC Class 3

IPC-A-610 for electronic assemblies and IPC/WHMA-A-620 for cable and wire harness assemblies, both to Class 3, plus WHMA.

Class 3 is the highest class IPC publishes. It applies where continued performance is required and where equipment cannot be taken out of service to fix a defect. We build to it as standard rather than as an upgrade.

Traceability and counterfeit control

Complete component traceability on every assembly, built on an ESD and humidity controlled floor. Counterfeit component mitigation in the procurement path. Audit-ready documentation packages that arrive with the equipment rather than being reconstructed later.

ITAR, NIST SP 800-171 and MIL-SPEC

ITAR registered, with NIST SP 800-171 for controlled unclassified information, and MIL-SPEC builds where the program calls for it.

The FSP Difference

15-week lead time
quoted across every
product line
1.5 billion in available capacity
across our 135,000
square foot campus
Made in America
BABA compliant for federal and
utility programs
98.6% on time delivery
everything downstream gets scheduled
against that date
99.7% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
Material held on forecast
VMI, consignment, and long-term storage
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

99.7% first pass yield. 98.6% on time delivery.

Work that is right the first time does not re-enter the queue, and a build with no rework ships on the date we gave you.