One program engineer owns your build, from kickoff to ship on every build.

We're an engineering-focused team, and one team carries your program from design through prototype to full-scale production, with one program manager who owns your build from kickoff to ship.
‍
What we see, you see. Your program team is named at kickoff, and your schedule, tracking and status come to you directly, on a cadence built around your needs.

Talk with a Program Engineer

Your Program, Visible From Kickoff To Shipment

One accountable Program Engineer. Proactive communication as requirements evolve.

  • One owner for the outcome

    Your Program Engineer owns technical actions, schedule follow-through and escalations from kickoff through shipment.

  • Status before you have to ask

    Know where your product is in the production line, what comes next and which decisions need your attention.

  • Built for changing requirements

    Design revisions and customer changes trigger impact review, documented change control and an updated plan.

  • Documentation ownership

    Point to point test records, as built drawings, bills of material and panel schedules, delivered with the equipment rather than chased afterward.

Your Program, Visible From Kickoff To Shipment

One accountable Program Engineer. Proactive communication as requirements evolve.

  • One owner for the outcome

    Your Program Engineer owns technical actions, schedule follow-through and escalations from kickoff through shipment.

  • Status before you have to ask

    Know where your product is in the production line, what comes next and which decisions need your attention.

  • Built for changing requirements

    Design revisions and customer changes trigger impact review, documented change control and an updated plan.

  • Documentation ownership

    Point to point test records, as built drawings, bills of material and panel schedules, delivered with the equipment rather than chased afterward.

Material management you can see

Components are managed in house, and you see the material position as clearly as we do.

Forecast-based inventory

We buy and hold material against your forecast, and review that forecast with you so what's on our shelf matches your plan.

Early warning on risk

Long-lead, single-source and end-of-life parts are flagged to you early, with alternates identified before they become a schedule problem. End-of-life parts keep being tracked across the production run, not only at design freeze.

Material visibility

Inventory, on-order and shortage status shared on a cadence you set.

Long-term storage

Raw material and finished goods held inside our own facility.

Kitting

Material staged in build order, so the line never waits on parts.

Risk comes out at design, not at the line

Our engineers scrub your BOM for long-lead, single-source and end-of-life parts during feasibility, and share the findings with you while there's still time to design around them.

Bill of materials scrub

Long-lead, single-source and end-of-life components flagged while there's still time to design around them.

Build versus buy analysis

What we fabricate and what we source is settled before anyone commits, with the reasoning shared with you. Alternates identified in advance, not in the middle of a shortage.

Obsolescence tracking

End-of-life parts are tracked across the production run, not just at design freeze, and replacements are qualified before the last buy, with changes documented and acknowledged before they reach the floor.

First article inspection

Documented and approved before production release, to standards as dictated by the design and application needs, with the results shared with you.

Open risk reporting

Risks, mitigations and open items are shared on a cadence you set, so you see what we see.

What the discipline and focus produce

98.6% first pass yield.

Work that is right the first time does not re-enter the queue.

99.7% on-time delivery.

Everything downstream of us gets scheduled against that date.

0.0% FIRST PASS
YIELD
0.0% ON-TIME
DELIVERY

The FSP Difference

Lead times as little as 15 weeks
On stocked configurations, with your real date quoted at order
$5 billion in installed capacity
across our 500,000
square foot campus
Made in America
BABA compliant and built in Baltimore
99.7% on time delivery
everything downstream gets scheduled
against that date
98.6% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

Send us a spec.

You will get back a drawing and a date.