Program management and supply chain control on every build.

Fifteen weeks, quoted, across every product line.

Fifteen weeks is what we quote. Not a best case, and not an expedite fee. It holds because the work that usually breaks a schedule happens before the schedule starts.

Validate Your Concept

Risk comes out before the design is finished

Every program starts with a bill of materials scrub that flags long lead, single source and end of life components while there is still time to design around them. Build versus buy analysis settles what we fabricate and what we source before anyone commits. Component cross referencing finds the alternates in advance rather than during a shortage.

That work happens during feasibility, so the supply chain risk is resolved before the first drawing is released.

Material is here before your order is

Vendor Managed Inventory programs

So the components that gate your build are held against forecast rather than ordered against your purchase order.

Long term raw material and finished goods storage

Inside our own facility.

Customer consignment programs

Where you want to own the material and have us hold it.

How We Deliver

One program manager for the life of the build

[Named on day one, with direct contact rather than a queue. Confirm this is a real model before it ships.]

Nothing is subcontracted

Engineering, build, and test happen in 135,000 square feet under one roof, backed by $1.5 billion in available capacity. No outside panel shop, no third-party integrator, and no schedule we do not control.

What the discipline produces

99.7% first pass yield. Work that is right the first time does not re-enter the queue.

98.6% on time delivery. Everything downstream of us gets scheduled against that date.

How does fifteen weeks compare?

The published index for low voltage switchgear is 54 weeks.¹ We quote fifteen, and the four things above are why.

The FSP Difference

15-week lead time
quoted across every
product line
1.5 billion in available capacity
across our 135,000
square foot campus
Made in America
BABA compliant for federal and
utility programs
98.6% on time delivery
everything downstream gets scheduled
against that date
99.7% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
Material held on forecast
VMI, consignment, and long-term storage
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

Send us a spec.

You will get back a drawing and a date.