Enclosures built around the generator you specified

Weather protection, sound attenuation and electrical integration for standby and prime power sets.

A generator arrives as a package. Getting it to work on a real site means an enclosure that survives the weather, holds the noise inside the property line, and connects cleanly to the distribution equipment beside it.

We build that enclosure and we do the electrical integration, which means the set, the controls and the distribution are handled by one supplier rather than three.

Request a Quote

What We Build

Weather protective enclosures

[fabricated in house or sourced? Confirm.]

Controls integration

[Paralleling, transfer, monitoring. Confirm scope.]

Sound attenuated enclosures

[to what level, measured at what distance? This is the number buyers compare.]

Electrical integration

Terminations, cable and bus connections into your distribution equipment.

Range

[What kW range do we build for? Confirm.]

Built to the standards the authority having jurisdiction will ask about

Counterfeit component mitigation and complete component traceability on every assembly. Component cross referencing to find alternates before an end of life part becomes a schedule problem.

Certifications

Engineered to the Highest Standards

The FSP Difference

Lead times as little as 15 weeks
On stocked configurations, with your real date quoted at order
$5 billion in installed capacity
across our 500,000
square foot campus
Made in America
BABA compliant and built in Baltimore
99.7% on time delivery
everything downstream gets scheduled
against that date
98.6% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

Send us the genset submittal

We will come back with an arrangement and a date.