SUCCESSFUL COMMISSIONING BEGINS LONG BEFORE EQUIPMENT ARRIVES ON SITE

Factory Acceptance Testing, on-site startup, system validation and handoff documentation, run by the same team that engineered and built the equipment.

Talk to an Engineer

What We Deliver

Factory Acceptance Testing (FAT)

Documented on-site or remote validation sessions before hardware ships, mapping performance back to your engineering specifications.

On-site startup and validation

Expert technicians in power, control, and mechanical systems travel to your facility to ensure equipment goes live smoothly.

System handoff documentation

Complete commissioning packages so your operations team has everything needed to operate and maintain the hardware.

Rapid site commissioning support

We don't disappear after the truck leaves. Direct support through startup, training, and initial operations.

Operations team training

Knowledge transfer sessions so your team can own the hardware confidently.

As-built documentation

Final drawings and records that reflect what's actually deployed, not just what was originally designed.

The FSP Difference

Lead times as little as 15 weeks
On stocked configurations, with your real date quoted at order
$5 billion in installed capacity
across our 500,000
square foot campus
Made in America
BABA compliant and built in Baltimore
98.6% on time delivery
everything downstream gets scheduled
against that date
99.7% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

Go live with the team that built it.

Continue working with the same engineering and manufacturing team through Factory Acceptance Testing, startup, commissioning, and final handoff.