Parts, retrofits, and obsolescence management for equipment already in service.

We keep the records and we keep the equipment running.

Talk to an Engineer

WHAT WE DELIVER

Parts and spares

Replacement components drawn against the original build record, so what arrives matches what is in the cabinet rather than what the catalog says should be.[Parts lead time. This is a different number from the 15 weeks on new builds and buyers will ask for it directly.]

Designed to be serviced

Our design reviews cover accessibility, service access and component replacement before anything is built. Equipment that was designed with a technician in mind costs less to maintain for its whole life, and our own service teams are the first to benefit from getting that right.

Retrofits and upgrades

[What work do we actually take on? Capacity increases, breaker replacements, controls and monitoring upgrades, arc flash mitigation? Confirm the scope before this ships, because the page will pull whatever it describes.]

Obsolescence management

The same component cross referencing we run at the feasibility stage on new designs, applied to equipment already installed. When a part reaches end of life we find the alternate and validate the substitution before you have a failure and no replacement.

The FSP Difference

Lead times as little as 15 weeks
On stocked configurations, with your real date quoted at order
$5 billion in installed capacity
across our 500,000
square foot campus
Made in America
BABA compliant and built in Baltimore
99.7% on time delivery
everything downstream gets scheduled
against that date
98.6% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

Tell us what you have

Send a nameplate photo or a serial number and we will pull the file.