The power room, delivered complete

Switchgear, controls and distribution integrated into a walk in enclosure and tested before it leaves the floor.

On a data center or industrial site, the constraint is rarely the equipment. It is the labor, the sequencing and the weather. Electrical rooms get built last, by trades competing for the same space, on a schedule that has already slipped upstream.

An e-house moves that work into a factory. The room is built, wired, tested and signed off indoors, then arrives on site as one delivery that needs power, cable and a crane.

Request a Quote

What We Build

E-House Integration

Prefabricated electrical houses engineered, integrated, and factory tested for rapid deployment.

Controls and monitoring

Control panels, metering and monitoring integrated to your architecture.

Interior systems

Lighting, HVAC, fire detection, cable tray, grounding.

Tested before it ships

Factory acceptance testing on the complete room rather than on loose equipment. Problems get found on our floor, where fixing one costs hours, instead of on yours, where it costs a crane and a crew.

What arrives with it

FAT reports, as built drawings, equipment documentation and a full bill of material for the complete room.

Range

[Size range, weight, shipping envelope, and the largest one we have delivered. An engineering buyer checks this before anything else on the page.]

Certifications

Engineered to the Highest Standards

The FSP Difference

Lead times as little as 15 weeks
On stocked configurations, with your real date quoted at order
$5 billion in installed capacity
across our 500,000
square foot campus
Made in America
BABA compliant and built in Baltimore
98.6% on time delivery
everything downstream gets scheduled
against that date
99.7% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

Start with a single line

Start with a single line. Send us a one line diagram and a site constraint, and we will come back with an arrangement and a date.