Automation equipment built to the controls architecture you already run.

Control panels, electromechanical assemblies, conveyance and robotics integration, delivered ready to commission.

We build automation equipment to the controls platform already running in your facility, and we validate it as a complete working system before it ships. Terminations, network layout and documentation all match the revision in the box, so commissioning is a startup rather than a rework.

Request a Quote

What We Build

Integrated control enclosures

UL 508A listed, with PLCs, HMIs and motion control built to your architecture.

Robotics, vision and sensor integration

Built and validated as a complete working system rather than as a box of compatible parts.

Electrical sub-assemblies

Pre-integrated and installation ready, so the work happens here instead of on your floor.

Production ready kitting

Sourcing, procurement and sequencing, so parts arrive at the line in build order.

Custom electromechanical enclosures

Designed to the application rather than adapted from a catalog.

Motor control centers and drive panels

Sourcing, procurement and sequencing, so parts arrive at the line in build order.

Conveyance and material handling

ARSAW, ARSTOW, DECANT and pallet conveyor systems.

Built to Integrate with Your Platform

Your PLC, your HMI, your motion control and your industrial network. We build to the standard already running in your facility so that commissioning is a startup rather than a rework.

Validated as a system, not as parts

Hardware and software integration validated together before shipment.

Automated wire prep and precision routing with complete component traceability and serialization.

Environmental Stress Screening and 100% functional testing.

On-site commissioning support  when the system reaches your floor.

Factory Acceptance Testing on the complete system.

Certifications

Engineered to the Highest Standards

The FSP Difference

15-week lead time
quoted across every
product line
1.5 billion in available capacity
across our 135,000
square foot campus
Made in America
BABA compliant for federal and
utility programs
98.6% on time delivery
everything downstream gets scheduled
against that date
99.7% first-pass yield
work that is right the first time does not re-enter the queue
100% functional and quality testing
every unit tested before it ships
Under one roof
engineering, build and test with
nothing subcontracted
Material held on forecast
VMI, consignment, and long-term storage
ESD and humidity controlled floor
a controlled environment for sensitive assemblies

What ships with it

Point to point test records, as built drawings, bills of material and panel schedules, all matching the revision in the box.

Send us a spec

You will get back a drawing and a date.